Industry

AI in Manufacturing

One machine going down should not cost you two days of replanning.

Manufacturing · Production planning

Before

The plan is rebuilt by hand every time an order moves or a machine goes down.

After

The plan updates itself, and shows what each change costs before you accept it.

A machine stops and the day is still planned.

Manufacturing · Goods receipt

Before

Delivery notes are typed into the system a second time by hand.

After

Documents are read and posted the moment they arrive.

Receiving closes the day it happens.

Manufacturing · Maintenance

Before

Engineers write up jobs on paper and nobody compares one to the next.

After

Every job is logged, and repeat failures are grouped by machine.

You replace the part before it stops the line.

Manufacturing · Supplier quotes

Before

Comparing three quotes means three formats and an afternoon in a spreadsheet.

After

Quotes are read and lined up side by side, like for like.

You buy on a price you can actually compare.

Manufacturing · Certificates

Before

Material certificates are chased by email and filed by hand, then hunted for at audit.

After

Certificates are collected, checked and filed against the batch as it runs.

An audit takes an hour, not a week.

Also relevantProfessional servicesDistribution & logisticsSalesFinance

Talk to us

Which part of your plant should go first?

No charge and no obligation. We look at how your work actually runs and name the three processes worth fixing first, with what each is costing you now.

Talk to us

Talk to us

Both fields are required.